PV8 Infinite possibilities for existing PV
PV8 · decision tools for your website

Give your visitors
a result worth
acting on.

Twelve embeddable energy tools. Your visitors explore a real scenario, see a clear report and choose whether to talk to your team.

Your website. PV8 calculations. Results before contact details.

12 focused decisions1 embed to install0 email gates to see a result
THIS IS WHAT YOUR VISITOR RECEIVESOpen full sample ↗
PV8Illustrative sample · not a real site
Mobility / CZ / EUR

Charging site brief

The assumed controlled charging demand fits the stated spare capacity.

Simultaneous grid demand166.7kW
Remaining import headroom13.3kW
Charging energy sold157.7MWh/year
Net operating cash€26,412EUR/year
Net present value€150,558.2EUR
Simple payback3.4years
Stated spare capacity180 kW
Charging grid demand166.7 kW

Before you progress

  • Confirm interval building demand and import limits.
  • Validate charging demand, installation costs and all tariff fees.
Assumptions & limits
  • Declared charger use and electrical headroom; no traffic forecast or connection approval.
  • Inputs are unverified. EUR only; no automatic currency conversion or jurisdiction-specific entitlement is inferred.
  • Constant year-end pre-tax unlevered cash flows. No inflation, degradation, financing, tax, replacement or terminal value. Payback is not a return guarantee.
  • Concurrency is an enforced aggregate output limit, not a promise about coincidental arrivals. Charging losses increase grid demand.
  • Utilisation is a user scenario, not forecast traffic. Include network, payment, maintenance and other fees in the stated costs. No solar contribution is assumed.
Inputs used in this assessment
Rated output per charging point150.0 kW
Charging points2.0 points
Spare site import capacity180.0 kW
Maximum simultaneous output50.0 % of installed power
Charging efficiency90.0 %
Average full-power-equivalent utilisation6.0 % of calendar hours
Charging sale price excluding VAT0.45 EUR/kWh
Purchased energy price0.22 EUR/kWh
Other annual operating costs6000.0 EUR/year
Total investment90000.0 EUR
Assessment term15.0 years
Discount rate7.0 %

Visitor-entered scenario assumptions · PV8 bounded scenario screening · PV8 shared finance core
Model: partner-scenarios-v2 · Reference: 97499f1d2150

Screening only · not an engineering design, investment recommendation or connection approval.
Explore the collection

A useful answer. A better conversation.

Every card shows a calculated sample. Open the report or change the inputs yourself.

Illustrative scenarios in EUR, not real-site assessments. Assumptions and scope limits are visible in every report.

12 widgets shown

StorageAvailable · screening

Battery sizing & value

Would a battery earn its keep?

SAMPLE DELIVERABLE

Storage value brief

Solar delivered later56.9MWh/year
Solar diverted from export63.2MWh/year
Half the capacity28.5 MWh/year
100 kWh; same power and daily assumptions
Selected capacity56.9 MWh/year
200 kWh; same power and daily assumptions
Double the capacity75 MWh/year
400 kWh; same power and daily assumptions
For your website
Battery installers & solar EPCs
For your visitors
Businesses and solar owners considering storage
Add to my website →
SolarAvailable · screening

Repowering opportunity

Is upgrading your solar plant worthwhile?

SAMPLE DELIVERABLE

Upgrade investment brief

Current generation1,100MWh/year
Proposed generation1,350MWh/year
Current generation1,100 MWh/year
Proposed generation1,350 MWh/year
For your website
Repowering EPCs & equipment suppliers
For your visitors
Owners of ageing solar plants
Add to my website →
MobilityAvailable · screening

EV charging feasibility

Could charging work at this site?

SAMPLE DELIVERABLE

Charging site brief

Simultaneous grid demand166.7kW
Remaining import headroom13.3kW
Stated spare capacity180 kW
Charging grid demand166.7 kW
For your website
Charger installers & charging operators
For your visitors
Landlords, hotels, retailers and site owners
Add to my website →
MobilityAvailable · screening

Fleet depot charging plan

Can every vehicle get the energy it needs?

SAMPLE DELIVERABLE

Depot energy-capacity brief

Minimum average grid power80kW
Deliverable average grid power ceiling120kW
Required average80 kW
Available ceiling120 kW
For your website
Fleet lessors & electrification consultants
For your visitors
Fleet managers planning a depot conversion
Add to my website →
PropertyAvailable · screening

Solar + storage property check

What could this roof do for its next occupier?

SAMPLE DELIVERABLE

Property energy opportunity card

Indicative solar capacity240kWp
Assumed annual solar production252MWh/year
Direct on-site use138.6 MWh/year
Battery delivery34.6 MWh/year
Remaining export74.9 MWh/year
For your website
Commercial-property portals & brokers
For your visitors
Tenants and buyers comparing premises
Add to my website →
Energy dealsAvailable · screening

Direct-wire feasibility

Could local solar lower a nearby buyer’s bill?

SAMPLE DELIVERABLE

Local supply feasibility brief

Delivered electricity after losses686MWh/year
Residual grid purchases814MWh/year
Buyer annual savings€24,010 EUR/year
Seller incremental cash€25,100 EUR/year
For your website
Solar developers & energy brokers
For your visitors
Generators and neighbouring electricity buyers
Add to my website →
InvestmentAvailable · screening

Quote & savings assumption check

Are these proposals really comparable?

SAMPLE DELIVERABLE

Comparable proposal worksheet

Proposal A: adjusted investment€108,000EUR
Proposal A: adjusted unit cost€1,080EUR/kWp
Proposal A€108,000 EUR
Quoted price plus your excluded-scope allowance
Proposal B€104,000 EUR
Quoted price plus your excluded-scope allowance
For your website
Independent advisers & procurement platforms
For your visitors
Businesses choosing an energy supplier
Add to my website →
SolarAvailable · screening

Export-limit & curtailment check

How much production could your export limit constrain?

SAMPLE DELIVERABLE

Export constraint brief

Surplus before export constraint650kW
Energy constrained in this power band135MWh/year
Surplus generation650 kW
Allowed export500 kW
For your website
Solar EPCs & battery developers
For your visitors
Owners planning expansion on a constrained connection
Add to my website →
InvestmentAvailable · screening

Project finance sensitivity

Which assumption changes the investment decision?

SAMPLE DELIVERABLE

Investment sensitivity brief

Net operating cash€27,000EUR/year
Net present value€-4,086.3EUR
Downside revenue€-67,841.7 EUR NPV
Revenue sensitivity; costs unchanged
Base revenue€-4,086.3 EUR NPV
Revenue sensitivity; costs unchanged
Upside revenue€59,669.1 EUR NPV
Revenue sensitivity; costs unchanged
For your website
EPCs, developers & energy advisers
For your visitors
Project buyers and investment teams
Add to my website →
PropertyAvailable · screening

What is my power connection worth?

Which entered project best fits this connection?

SAMPLE DELIVERABLE

Connection opportunity comparison

Candidates within entered constraints2of 3
Highest feasible scenario NPV€105,395.7EUR
Solar€27,884.9 EUR NPV
Fits stated capacity and budget
Battery€105,395.7 EUR NPV
Fits stated capacity and budget
Charging · outside limits€75,021.6 EUR NPV
Exceeds import limit
For your website
Infrastructure developers & property advisers
For your visitors
Landowners exploring energy opportunities
Add to my website →
Energy dealsAvailable · screening

Build an energy deal with your neighbour

Is there a price at which both sides benefit?

SAMPLE DELIVERABLE

Two-sided energy deal brief

Delivered electricity after losses686MWh/year
Residual grid purchases814MWh/year
Buyer annual savings€24,010 EUR/year
Seller incremental cash€25,100 EUR/year
For your website
Energy brokers & industrial-park operators
For your visitors
Willing generators and nearby energy buyers
Add to my website →
SolarAvailable

Solar performance check

Does the production gap warrant investigation?

SAMPLE DELIVERABLE

Generation gap brief

Measured generation88MWh/period
Shortfall to lower expectation17MWh/period
Measured88 MWh/period
Expected lower bound105 MWh/period
Expected upper bound115 MWh/period
For your website
O&M providers & monitoring companies
For your visitors
Owners checking a possible production shortfall
Add to my website →

Built for your business. Useful to your visitors.

Property portals

Add energy screening beside an industrial-property or operating solar-asset listing. Prefill the property’s published facts and let visitors explore their own demand or investment assumptions.

Listing data is editable and is never presented as independently verified.

EPC websites

Give plant owners a first repowering or direct-wire comparison before they request a proposal. Receive the selected scenario and assumptions with their enquiry.

Production, equipment suitability and construction scope still need your engineering review.

O&M websites

Help customers explore the value of a proposed upgrade. With Business, replay supplied hourly export against a changed capacity and export limit.

Use the results to scope diagnostics and compare repair with replacement.

Three ways to integrate

01 · EMBED

Copy into your website

Use a hosted iframe on WordPress, Webflow or a custom site. No API key goes into the page. Register the exact website origin where it may appear.

02 · COMPONENT

Connect a listing

A small JavaScript component mounts the calculator, prefills supported inputs and emits a completion event. Your visitor can review every value before calculating.

03 · API / PRIVATE PORTAL

Connect your software

Submit scenarios from your backend with a scoped API key. Business also accepts aligned hourly profiles. Existing asset API access remains separately permissioned.

Try the visitor experience

These examples use illustrative EUR inputs. They are not a forecast for a real property and do not send enquiries.

Change the inputs to explore the assumptions.

Choose the integration depth you need

Loading plans…

Prices in EUR per month, excluding VAT where applicable. Allowances are shared across your workspace and reset each UTC calendar month. No rollover, automatic overage or charge for an exact retry within 30 days. These plans cover widget screenings; full workspace assessments and asset access have their own entitlements.

Your website widgets

Create a widget, copy its integration code and review enquiries that visitors choose to share. Visitors can see results without providing contact details.

Checking your workspace…

For your developer

The component supports reviewed prefill and a completion event. It never sends a visitor’s financial result to the parent page automatically. Business API keys stay on your server.

Component example · Pro and Business
<div id="pv8-assessment"></div>
<script src="https://pv8.ai/ui/widgets/component.js"></script>
<script>
const widget = PV8Widgets.mount({
  target: '#pv8-assessment', widgetId: 'YOUR_WIDGET_ID',
  prefill: {country: 'CZ', annual_generation_mwh: 1100},
  onComplete: () => console.log('Assessment completed')
});
// Later: widget.update({annual_generation_mwh: 1200});
// On route change: widget.destroy();
</script>
Server API example · Business
POST /api/v1/widgets/YOUR_WIDGET_ID/assessments
Authorization: Bearer YOUR_SERVER_KEY
Idempotency-Key: a-unique-key-for-this-input-set
Content-Type: application/json

{
  "country": "CZ", "currency": "EUR",
  "annual_generation_mwh": 1100,
  "proposed_generation_mwh": 1350,
  "energy_value_eur_mwh": 75,
  "capex_eur": 140000, "incremental_opex_eur_year": 1000,
  "term_years": 20, "discount_rate_pct": 7
}

Use the run:widgets scope. Create a widget-only key above or with POST /api/v1/widgets/keys while signed in. Revoke it with DELETE /api/v1/keys/{id}. Use a new idempotency key when inputs change. Failed validation does not consume an assessment.

Hourly profiles contain one complete UTC calendar year of consecutive hourly MWh values (8760 or 8784). Supply the generation series and, for direct wire, an aligned demand series. The OpenAPI contract defines the fields and required scenario assumptions.

Choose an EU-27 country, Japan, Turkey or Australia as the review jurisdiction. All widget money inputs and outputs are explicitly EUR. Local permits, support arrangements, taxes and supply rules require a separate review.