Depot energy-capacity brief
The aggregate energy balance fits; individual vehicles still need a feasible charging schedule.
Minimum average grid power80kW
Deliverable average grid power ceiling120kW
Grid energy needed per window800kWh
Energy deficit at the ceiling0kWh/window
Required average80 kW
Available ceiling120 kW
Before you progress
- Collect each vehicle’s arrival, departure, route and charge limits.
- Confirm charger access, switching arrangements and interval headroom.
Assumptions & limits
- Aggregate energy balance with an ideal shared window; not a vehicle-level charging schedule.
- Inputs are unverified. EUR only; no automatic currency conversion or jurisdiction-specific entitlement is inferred.
- Vehicles share one ideal window; vehicle power limits, arrival/departure differences and plug switching are not simulated. Charger nameplate power is a ceiling.
Inputs used in this assessment
| Vehicles charging in the window | 12.0 vehicles |
|---|---|
| Energy needed by each vehicle | 60.0 kWh |
| Shared charging window | 10.0 hours |
| Output power per point | 22.0 kW |
| Charging points | 12.0 points |
| Charging efficiency | 90.0 % |
| Spare site capacity throughout window | 120.0 kW |