PV8Illustrative sample · not a real site
Mobility / CZ / EUR

Charging site brief

The assumed controlled charging demand fits the stated spare capacity.

Simultaneous grid demand166.7kW
Remaining import headroom13.3kW
Charging energy sold157.7MWh/year
Net operating cash€26,412EUR/year
Net present value€150,558.2EUR
Simple payback3.4years
Stated spare capacity180 kW
Charging grid demand166.7 kW

Before you progress

  • Confirm interval building demand and import limits.
  • Validate charging demand, installation costs and all tariff fees.
Assumptions & limits
  • Declared charger use and electrical headroom; no traffic forecast or connection approval.
  • Inputs are unverified. EUR only; no automatic currency conversion or jurisdiction-specific entitlement is inferred.
  • Constant year-end pre-tax unlevered cash flows. No inflation, degradation, financing, tax, replacement or terminal value. Payback is not a return guarantee.
  • Concurrency is an enforced aggregate output limit, not a promise about coincidental arrivals. Charging losses increase grid demand.
  • Utilisation is a user scenario, not forecast traffic. Include network, payment, maintenance and other fees in the stated costs. No solar contribution is assumed.
Inputs used in this assessment
Rated output per charging point150.0 kW
Charging points2.0 points
Spare site import capacity180.0 kW
Maximum simultaneous output50.0 % of installed power
Charging efficiency90.0 %
Average full-power-equivalent utilisation6.0 % of calendar hours
Charging sale price excluding VAT0.45 EUR/kWh
Purchased energy price0.22 EUR/kWh
Other annual operating costs6000.0 EUR/year
Total investment90000.0 EUR
Assessment term15.0 years
Discount rate7.0 %

Visitor-entered scenario assumptions · PV8 bounded scenario screening · PV8 shared finance core
Model: partner-scenarios-v2 · Reference: 97499f1d2150