Export constraint brief

Investigate storage or flexible demand against the timing of these constraints.

Surplus before export constraint650kW
Energy constrained in this power band135MWh/year
Gross value of constrained energy€9,450EUR/year
Surplus generation650 kW
Allowed export500 kW

Before you progress

  • Replay measured generation and demand against the actual export limit.
  • Check the timing of constraints before sizing storage or flexible loads.
Assumptions & limits
  • One user-defined power band; not a full-year dispatch or a battery recovery forecast.
  • Inputs are unverified. EUR only; no automatic currency conversion or jurisdiction-specific entitlement is inferred.
  • The same generation and load are assumed for every entered constrained hour. No battery recovery, negative-price response, compensation or other hours are modelled.
Inputs used in this assessment
Generation during constrained hours800.0 kW
Simultaneous on-site consumption150.0 kW
Permitted export power500.0 kW
Hours at these power levels per year900.0 hours
Value of otherwise exported electricity70.0 EUR/MWh

Visitor-entered scenario assumptions · PV8 bounded scenario screening
Model: partner-scenarios-v2 · Reference: 2508e8c2753c