Direct-wire energy supply

Rank nearby buyers and test load match, cable route and delivered cost.

See it on the sample siteTry this in the tourThe same steps on one illustrative 1 MWp site, with live layouts and figures.

Screen a buyer and route

PV8 combines planned and operating demand leads with generation, distance, route obstacles, voltage and commercial assumptions.

  1. Review public buyer leads and add any buyer the owner already knows.
  2. Confirm load, operating hours and connection point.
  3. Draw or import the cable route and record crossings and land rights.
  4. Model delivered energy, losses, wheeling or private-wire structure and price.

Did this answer your question?

Your response helps PV8 improve the next guide.

Still need a hand?

Bring the decision, not a support ticket.

Tell PV8 what you are trying to decide and which asset or result is involved.
Contact PV8 →