Solar / CZ / EUR
Upgrade investment brief
Compare the proposed generation uplift with the investment and operational changes.
Current generation1,100MWh/year
Proposed generation1,350MWh/year
Additional generation250MWh/year
Incremental net operating cash€17,750EUR/year
Net present value€48,043.8EUR
Simple payback7.9years
Current generation1,100 MWh/year
Proposed generation1,350 MWh/year
Before you progress
- Check existing support and offtake contracts before valuing additional output.
- Have an EPC verify yield, export capacity, equipment compatibility and downtime.
- Ask O&M to compare recoverable operational losses with replacement benefits.
Assumptions & limits
- All money is entered and reported in EUR; no automatic currency conversion.
- Pre-tax, unlevered screening with constant annual cash flows; no inflation, grants, financing or terminal value.
- Country identifies the review jurisdiction; no permit, tax exemption, tariff entitlement or grid approval is inferred.
- Proposed production is your assumption, not a PV8 yield prediction. Include clipping, degradation and downtime in that figure.
Inputs used in this assessment
| country | CZ |
|---|---|
| currency | EUR |
| Current annual generation | 1100.0 MWh/year |
| Total investment | 140000.0 EUR |
| Assessment term | 20 years |
| Discount rate | 7.0 % |
| Proposed annual generation | 1350.0 MWh/year |
| Additional energy value | 75.0 EUR/MWh |
| Additional operating costs | 1000.0 EUR/year |
Visitor or partner scenario inputs · PV8 shared finance core
Model: partner-screening-v1 · Reference: 0e7f8bea6fde