Investment / CZ / EUR
Comparable proposal worksheet
Compare adjusted scope and unit costs before choosing; a lower total is not proof of a better proposal.
Proposal A: adjusted investment€108,000EUR
Proposal A: adjusted unit cost€1,080EUR/kWp
Proposal A: common-basis NPV€-4,169.8EUR
Proposal B: adjusted investment€104,000EUR
Proposal B: adjusted unit cost€1,040EUR/kWp
Proposal B: common-basis NPV€-169.8EUR
Proposal A€108,000 EUR
Quoted price plus your excluded-scope allowanceProposal B€104,000 EUR
Quoted price plus your excluded-scope allowanceBefore you progress
- Request written confirmation of excluded work and recurring fees.
- Compare equipment, roof scope, warranties and generation evidence.
Assumptions & limits
- Manually normalised solar proposals; allowances are user scenarios, not supplier quotations. No PDF extraction.
- Inputs are unverified. EUR only; no automatic currency conversion or jurisdiction-specific entitlement is inferred.
- Allowances are scenarios, not supplier prices. Equipment quality, warranty and contract scope are not inferred.
- Both proposals use the entered common yield and blended energy value with constant cash flows; roof geometry, self-consumption differences, degradation and taxes are not modelled.
Inputs used in this assessment
| Proposal A quoted investment | 96000.0 EUR |
|---|---|
| A: allowance for excluded scope | 12000.0 EUR |
| A: solar capacity | 100.0 kWp |
| Proposal B quoted investment | 104000.0 EUR |
| B: allowance for excluded scope | 0.0 EUR |
| B: solar capacity | 100.0 kWp |
| Common net yield assumption | 1050.0 kWh/kWp |
| Common blended electricity value | 120.0 EUR/MWh |
| A: annual operating costs | 1200.0 EUR/year |
| B: annual operating costs | 1200.0 EUR/year |
| Assessment term | 15.0 years |
| Discount rate | 7.0 % |
Visitor-entered scenario assumptions · PV8 bounded scenario screening · PV8 shared finance core
Model: partner-scenarios-v2 · Reference: 3add4dff67fd