PV8Illustrative sample · not a real site
Property / CZ / EUR

Connection opportunity comparison

Battery has the highest entered-scenario NPV among feasible candidates.

Candidates within entered constraints2of 3
Highest feasible scenario NPV€105,395.7EUR
Solar€27,884.9 EUR NPV
Fits stated capacity and budget
Battery€105,395.7 EUR NPV
Fits stated capacity and budget
Charging · outside limits€75,021.6 EUR NPV
Exceeds import limit

Before you progress

  • Establish connection rights, remaining capacity and transfer restrictions.
  • Validate each candidate with site studies; do not add these mutually exclusive cash flows together.
Assumptions & limits
  • Comparison of mutually exclusive, user-entered projects; not a valuation of connection rights or automatic site development.
  • Inputs are unverified. EUR only; no automatic currency conversion or jurisdiction-specific entitlement is inferred.
  • Annual cash and capacity requirements are supplied by the user, not generated by a site study. Candidates are mutually exclusive. No combined dispatch, land availability, connection approval or transferable rights valuation is inferred.
Inputs used in this assessment
Available import capacity250.0 kW
Available export capacity500.0 kW
Investment budget400000.0 EUR
Solar: investment300000.0 EUR
Solar: annual net operating cash36000.0 EUR/year
Solar: import requirement0.0 kW
Solar: export requirement400.0 kW
Battery: investment350000.0 EUR
Battery: annual net operating cash50000.0 EUR/year
Battery: import requirement200.0 kW
Battery: export requirement200.0 kW
Charging: investment180000.0 EUR
Charging: annual net operating cash28000.0 EUR/year
Charging: import requirement300.0 kW
Charging: export requirement0.0 kW
Assessment term15.0 years
Discount rate7.0 %

Visitor-entered scenario assumptions · PV8 bounded scenario screening · PV8 shared finance core
Model: partner-scenarios-v2 · Reference: 9c0c70136741